Back in 2008 my wife and I decided to build ourselves a house. We did it part-time, working mornings only, and it took about four years. Apart from the foundations and the plastering, which we left to professionals, we did the whole thing ourselves.
The architect's drawing. Where it all began: the design for the house by our wonderful architect, JB. I shall not use anyone's name here as I have no consents to do so, but if JB sees this I hope he is proud of what he did for us. There were periods when we couldn't get him to come without considerable delay; then he was simply known as Godo.Foundations. The basic foundations were one of only two jobs we handed over to professionals. Here their work is complete and we are still clearing roots and preparing for a membrane and shingle. We are also laying in the drains.The timber frame. The timber frame starts to rise. It is on a timber floor built to bridge the block foundation. The marquee in the background was home to the tools and materials.Friends lend a hand. This was a major occasion. We invited friends to lunch, before which they helped us install the ground floor windows. A brilliant day: the windows went in fast, lunch was a very happy occasion and the last guests left (a little the worse for wear) at 11.00 pm.Roof structure. The first rafters go up on the main roof. The ground floor box was now complete and we had a floor for the scaffold tower to work from.The shell takes shape. The frame is now partially clad with a board made, without glue, just by compressing wood fibres. It is extremely tough and weather resistant. Scraps of it lying around outside many years later are still good. The upstairs windows are going in thanks to a local farmer and his telehandler. Scary moments: they are heavy and expensive. The roof timbers are on their way, all cut by hand.Roof covering. The roof is now on and covered in its first layer of sarking board, with felt going on top of that.Slating. Fortunately C loves being on roofs. Here she is fixing the plastic slates with a nail gun. There were about 3,200 slates, each with two nails. The good news was that they are quite light and I was able to carry them up in bundles, 25 at a time.Inside during all this. A temporary staircase and continually moving piles of stuff and scaffold.Plastered. Plastered, with some paint and some flooring. The stairs were a great challenge, all made from plywood. I'll never forget 200mm risers and 220mm treads. It does look a bit like the finished article now. The plastering was the only other major job we didn't do ourselves.The finished article. The finished house and garden, some years later. The wisteria has since died.